Developer
SMARTER MATERIAL SELECTIONS CAN MAKE ALL THE DIFFERENCE FOR YOUR DESIGN

IMPROVEMENT SCORE FROM DESIGN
ENERGY EFFICIENCY KW SAVED PER HOUR
ENERGY EFFICIENCY KW SAVED PER HOUR
EXECUTIVE SUMMARY
Penny and John specialise in developing childcare centres with a reliable formula that balances land costs, build costs, and project returns. As compliance standards evolved, they needed to adapt their approach without affecting feasibility. By refining material choices and construction methods, they maintained their design intent, met 7-star requirements, and improved both capital and operational performance.
THE DETAILS
THE CHALLENGE
With a clear formula for balancing site acquisition and build costs, Penny and John had a proven approach to childcare development.
However, rising compliance standards introduced new pressures that risked impacting their returns. They needed a way to meet 7-star targets without overhauling their design or exceeding their carefully calculated budgets.
THE SOLUTION
By working with Redistar to review their designs through a compliance lens early in the process, Penny and John explored alternative materials and methods that aligned with their performance needs and financial model.
This not only ensured the buildings met current energy requirements but also reduced long-term operational costs. Their formula continues to evolve, delivering projects that meet the needs of families, regulators, and investors alike.